Skip to content
RICITIES, Green Infrastructure
ProposalSubmitted to the FCTA

Clean FCT: science based waste management and refined processing plants

A proposal to the Federal Capital Territory Administration for six waste refined processing plants, one for each FCT area council, turning solid waste into value through sorting, recovery and recycling.

Mixed recyclable waste piled on the tipping floor of a large materials recovery facility, ready for sorting

A materials recovery facility in Brooklyn, New York: the kind of sorting and recovery plant the proposal describes. Not an FCT site.

Submitted to
Federal Capital Territory Administration
Date
25 October 2024
Plants
Six, one per area council
Delivery
18 months, design to commissioning

Abuja, as Nigeria’s administrative capital, should lead on the physical environment and climate. Our proposal to the FCTA offers a scientific approach to solid waste: Science Based Management, delivered through waste refined processing plants.

Garbage Free. Clean FCT.

The FCTA neighbourhood vision the proposal sets out to fulfil

01From disposal to a waste to wealth value chain

The concept embraces the circular economy. Instead of collecting waste only to bury it, each plant recovers materials and returns them to the economy, with the aim of a clean city and full compliance across every municipality, district and town in the territory.

Waste refined processing plant · value chain

  1. 01 · CollectNeighbourhood wasteMixed solid waste from homes, markets and businesses across each area council.
  2. 02 · SortSorting and separationConveyors, screens and optical sorters split paper, plastic, metal and glass.
  3. 03 · CompactCompaction and balingBalers, compactors and shredders cut volume for storage and transport.
  4. 04 · ProcessRefiningGranulators, extruders and pelletisers turn materials into feedstock and products.
  5. 05 · MoveMaterial handlingForklifts and cranes store and dispatch processed material.
  6. 06 · SellBack into the economyRecovered materials supply manufacturers: waste becomes wealth.
Equipment categories as specified in the proposal. Final configuration depends on site, waste survey and vendor selection.

02Six plants, one for each area council

  1. 01

    Abaji

    One waste refined processing plant, sited and sized to the council’s waste survey.

  2. 02

    Abuja Municipal

    One waste refined processing plant, sited and sized to the council’s waste survey.

  3. 03

    Bwari

    One waste refined processing plant, sited and sized to the council’s waste survey.

  4. 04

    Gwagwalada

    One waste refined processing plant, sited and sized to the council’s waste survey.

  5. 05

    Kuje

    One waste refined processing plant, sited and sized to the council’s waste survey.

  6. 06

    Kwali

    One waste refined processing plant, sited and sized to the council’s waste survey.

Plants proposed across the FCT
6
Design, procurement, installation and commissioning
18 months
Design life of the plant technology
25 years
Reference capacity of recently built plants used for estimating
50 TPD

Capital and operating costs, engineering structures and detailed design follow engagement, site selection and design specifics, in line with global best practice.

03What RICITIES commits to

  • Design and build the facilities through an eco friendly approach, with pro climate specifications and green fabric structures.
  • Design and supply plant equipment that meets the relevant environmental laws and regulations.
  • Develop the infrastructure with current technology, in the right way for the environment.
  • Reduce climate impact by actively promoting recycling and the cost effective use of natural resources.

Institutional engagement

Managing waste for a city or estate?

We can adapt the science based management model and plant design to other cities, districts and large developments.