Skip to content
RICITIES, Green Infrastructure
Project reviewMultimodal network, partly operational

The Lagos mass transit network: a review of what exists

What has Lagos actually built, what is coming, and what is still only a line on a map?

Rail, BRT, regulated buses, ferries and interchanges, coordinated by LAMATA under the Strategic Transport Master Plan. This review separates what operates today from what is under way and what is still proposed.

A Lagos BRT bus park under canopy shelters, with yellow minibuses and passengers on the forecourt
A BRT terminal in Lagos, where trunk buses and yellow minibuses meet: the network depends on both.
Planning authority
LAMATA
Master plan horizon
Under review, to 2048
Rail corridors
Six, plus a monorail concept
Waterways programme
Omi Eko, about €410 million

The starting point is the Strategic Transport Master Plan, coordinated by the Lagos Metropolitan Area Transport Authority. It was drawn up to guide transport needs to 2032 and is being reviewed to look ahead to 2048.

The intended system is not a collection of railway lines. It is a multimodal network of rail, BRT, regulated buses, ferries, interchanges, walking routes and digital systems. The key is to separate what operates, what is being built, what is approved and what remains a long term idea.

01Who is responsible for what

InstitutionPrimary responsibility
Lagos State Ministry of TransportationPolicy direction, sector oversight and coordination
LAMATAStrategic planning, mass transit infrastructure, BRT, rail, bus franchising and integration
LASWAInland waterways regulation, safety, infrastructure and terminals
LAGFERRYState ferry operations
LBSLState owned bus operations
LASTMATraffic management, enforcement and incident response
Lagos State Parking AuthorityParking management and regulation
Motor Vehicle Administration AgencyVehicle registration
Vehicle Inspection ServiceRoadworthiness inspection
LASDRIDriver training and education

LAMATA plans and coordinates the network. LASWA regulates and develops the waterways, while LAGFERRY runs ferries. LBSL operates buses; it is not the planning authority.

02Urban rail

Lagos Rail Mass Transit · six corridors

  • BlueOkokomaiko · Mile 2 · MarinaMarina to Mile 2 in service; three stations targeted Feb 2027
  • RedAgbado · Ikeja · Oshodi · Yaba · Oyingbo · MarinaAgbado to Oyingbo in service since Oct 2024
  • GreenMarina · VI · Lekki · Ajah · Lekki Free Trade ZoneDevelopment agreements and MoU; not under construction
  • PurpleRedemption Camp · Mowe · OjoLong term corridor
  • YellowOtta · National TheatreLong term corridor
  • OrangeIkeja · AgbowaLong term corridor

Scale: Long term corridor · Agreements and studies · Partly in service, extending · First phase in service

Status as publicly reported to November 2026. Long term corridors are planning proposals, not funded or construction ready projects.

The Red Line’s first phase runs on infrastructure shared with the Nigerian Railway Corporation, with eight principal stations: Agbado, Iju, Agege, Ikeja, Oshodi, Mushin, Yaba and Oyingbo. Its extension to Marina and airport links belong to the wider plan.

The 68 km Green Line is arguably the most economically significant proposal: Marina, Victoria Island, Lekki, Ajah, Lekki Phase II, Ogombo, Elepetu and Eluju to the planned Lekki airport and Free Trade Zone. It should be planned together with Lekki Deep Seaport, the Free Trade Zone and the wider Lekki–Epe growth corridor.

03BRT, quality bus corridors and feeder buses

LAMATA’s Bus Reform Initiative sets out to formalise bus transport across the state. A 2012 study identified 485 bus routes; the 2014 revision of the master plan identified 14 BRT corridors.

CorridorFunction
Mile 12 · Ketu · Ojota · CMS/TBSEastern Lagos to the central business district
Ikorodu · Fadeyi · Yaba · TBSHigh volume Ikorodu commuter corridor
Oshodi · Abule EgbaWestern and northwestern connection
Lagos–Badagry ExpresswayWestern gateway corridor, still under development
  1. 011A

    Ketu · Alapere · Akanimodo

    Quality Bus Corridor package in LAMATA’s 2025 progress report.

  2. 021B

    Yaba · Lawanson · Ijesha · Cele

    Quality Bus Corridor package in LAMATA’s 2025 progress report.

  3. 032

    Abule Egba · Iju Ishaga

    Quality Bus Corridor package in LAMATA’s 2025 progress report.

  4. 043

    Igando · Iyana Iba

    Quality Bus Corridor package in LAMATA’s 2025 progress report.

Below the trunk routes sit standard services between activity centres and First and Last Mile community buses that feed them, organised across seven planning zones from Ikeja and Ketu to Ikorodu. Operators include LBSL, TSL Metroline, Amalgamated TSL and TEEJAY Motors, with the Cowry Card on formalised routes.

04Waterways and ferries

Lagos’s lagoons and creeks are an extraordinary advantage. LagFerry’s published network links terminals including Ipakodo and Ijede in Ikorodu, Five Cowries in Falomo, Marina and Ebute Ero on Lagos Island, Badore in Ajah, Mile 2, Ebute Ojo, Ijegun Egba and Liverpool in Apapa.

Omi Eko investment, backed by AFD, the EU and EIB
€410m
Priority ferry routes
15
Waterways to dredge and channel
140 km
Terminals and jetties to build or upgrade
25

Omi Eko also plans around 78 electric or hybrid ferries, charging, maintenance, digital ticketing and intelligent transport systems, from 2024 to 2030.

05Where the network falls short

GapRequired intervention
Western LagosComplete the Blue Line to Okokomaiko and integrate Badagry corridor buses
Lekki–EpeAccelerate Green Line preparation and protect its right of way
IkoroduStrengthen rail feasibility with ferry and feeder bus integration
Ogun–Lagos commutingCoordinate rail and bus planning with Ogun State
Northern LagosRail and quality bus links towards Ayobo and Iyana Ipaja
The IslandIntegrate Marina, CMS, Victoria Island, Ikoyi and Lekki nodes
AffordabilityFare integration and targeted commuter support
First and last mileMore feeder buses, walking and cycling routes
FreightSeparate truck staging and port access from commuter corridors
DataA single metropolitan mobility data platform

06One integrated architecture

One network, six tiers

  1. Tier 1Urban railHigh capacity metropolitan movement
  2. Tier 2BRT and Quality Bus CorridorsHigh volume road based transit
  3. Tier 3Standard bus servicesConnect secondary urban centres
  4. Tier 4First and last mile busesNeighbourhood access
  5. Tier 5Ferries and water transportCross lagoon movement
  6. Tier 6Walking and cyclingSafe access to every stop

Supporting: interchanges, common fares and passenger information

Our proposed way to organise the documented network into a single operating system. Interchanges and shared digital systems tie the tiers together.

Sources

  1. 01LAMATA: Strategic Transport Master Plan, rail, bus reform and project updates
  2. 02LagFerry: routes, schedules and terminals
  3. 03AFD: Lagos State, AFD, the European Union and the EIB launch Omi Eko
  4. 04Nairametrics: Blue Line extension to FESTAC, Alakija and Trade Fair

An independent RICITIES review of a project led by others. Figures and statuses are as publicly reported to November 2026 and should be checked against the latest agency records before being relied on.

Institutional engagement

Working on a project like this?

We help agencies, investors and communities test infrastructure proposals against what they will actually deliver: productivity, resilience and public value.

Lagos as a Lab

More project reviews

About the programme
  • Aerial view of the Third Mainland Bridge curving across Lagos Lagoon beside the Adekunle waterfront01

    Unbuilt · preferred bidder named 2022

    Fourth Mainland Bridge

    Why has a $2.5 billion corridor stayed unbuilt for more than twenty years?

    Read the review
  • Waves breaking on the sandy Atlantic shoreline at Lagos02

    Under construction, section by section

    Lagos–Calabar Coastal Highway

    How do you build a long life concrete highway beside an eroding ocean?

    Read the review
  • Elevated Blue Line rail viaduct and Mile 2 station in Lagos03

    Marina to Mile 2 in service since 2023

    Lagos Blue Line

    What does the Blue Line teach about the gap between engineering and delivery?

    Read the review